Sinopec Sulfur Forming Work Site

Sinopec Sulfur Forming

Location: Puguang, China

Matrix PDM Engineering was awarded a contract to build an 8,600 ton per day sulfur forming facility for Sinopec for the Puguang Gas Project. This facility utilizes the Devco II Sulfur Forming Process. Matrix PDM also provided technical assistance for the sulfur handling system.

This facility is China’s first large-scale sulfur export facility. An important step in large scale sulfur production was the adoption of a national standard for Premium Sulfur Product. This standard (GB-T 2449-2006 Sulfur for Industrial Use) mandates moisture content and particle size, which are both met by the Devco II Process.

8600tpd
Total sulfur forming capacity
100%
Commitment to safety
1st
Large-scale sulfur export facility in China

Scope of Work

  • Engineering and Design
  • Sulfur Forming
  • Material Handling
Sinopec
Devco II
Engineering
Sulfur Forming

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.

Please select an option from the drop down to see the contact information.

Business Development
John Hart
Phone: 360 685 2030
Email: jhart@matrixservice.com
Business Development
Doug Montalbano
Phone: 312 754 6605
Phone: 877 367 6879
Email: dmontalbano@matrixnac.com
Business Development
Bevan Houston
Phone: 918 281 6036
Phone: 866 367 6879
Email: bevanhouston@matrixpdm.com
Business Development
Bevan Houston
Phone: 918 281 6036
Phone: 866 367 6879
Email: bevanhouston@matrixpdm.com
Business Development
Doug Montalbano
Phone: 312 754 6605
Phone: 877 367 6879
Email: dmontalbano@matrixnac.com
Business Development
John Hart
Phone: 360 685 2030
Email: jhart@matrixservice.com
Jeff Heath
North America: 866 367 6879
International: +61 2 9317 5900
Email: jheath@matrixappliedtech.com

Please select an option from the drop down to see the contact information.

top