Skip to main content Go to contact form
Multi-Product Dock and Terminal Expansion in Charleston, South Carolina

Kinder Morgan – Shipyard River Terminal (SRT) Expansion

Location: Charleston, South Carolina

The Shipyard River Terminal (SRT) was expanded in 2001 to enhance the terminal’s ability to handle non-cement related products including clinker, potash, bituminous and sub-bituminous coal, salt, urea and asphalt.

In 2000, Matrix PDM Engineering transformed the original SRT berth known as Dock #1 into one of the most efficient cement facilities in the world. Six months later, construction began on Dock #2 and its related infrastructure and components.

Matrix PDM worked with the client to provide an economic feasibility study, preliminary and final engineering and construction management for the expansion of Dock #2. Design included modification to the existing dock and a new inbound conveyor system to transport various commodities. Additionally, new storage, reclaim and truck and rail loading solutions were designed for the facility expansion.

Principal features:
Inbound conveyor system consisting of 54-inch belts with variable conveying rates
Warehouse system with a two-directional tripper capable of receiving material from docks #1 and #2
Fuel product outdoor storage piles created by a series of stacking tubes and radial stackers
Tunnel reclaim system comprised of a series of variable feed vibrating feeders
New unit train loading station, capable of loading a train in less than eight hours
Covered truck/rail loading, using front end loaders
Existing dock modified and lengthened to receive Panamax-size vessels

68000
Square feet of warehouse storage
100%
Commitment to safety

Scope of Work

  • Economic feasibility study
  • Preliminary and final engineering
  • Construction management
Marine structures
Material handling
Terminal expansion
Matrix PDM Engineering

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop