Skip to main content Go to contact form
Hawaiian Cement Import Facility hero image

Hawaiian Cement Import Facility – Bulk Terminal EPC

Location: Barbers Point - Oahu, Hawaii

The Hawaiian Cement Terminal was designed as a state-of-the-art cement import terminal with initial throughput of 500,000 tpy.

Matrix PDM Engineering provided the economic feasibility study and all of the associated engineering, procurement and construction management services for the facility.

Design included two new storage domes, a pneumatic transport system, unloader, and barge and truck loadout. Additionally, Matrix PDM provided electrical and automation solutions including automating the mechanical reclaimer and ship unloader, barge and truck loadout systems and bill of lading system.

600mtph
Peak capacity cement unloader
2x40000
Metric ton capacity storage domes
400mtph
Mechanical reclaimers

Scope of Work

  • Economic feasibility study
  • Conceptual, preliminary, and final engineering
  • Construction management
Engineering
Construction management
Cement import

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop