Enbridge Stockbridge – Aboveground Storage Tank Construction

Location: Stockbridge, Michigan

Matrix NAC was awarded the construction of 5 crude tanks for Enbridge in Stockbridge, MI. Matrix NAC self-performed the final 20% scope of work. The civil site scope to accommodate new tanks included approximately 300,000 direct Matrix NAC man hours.

5
cone roof tanks with ringwall foundations
1100
CMC supports installed beneath tank
300K
man hours
100%
Commitment to safety

Scope of Work

  • Construction of 5 223' x 56' aboveground storage tanks including ringwall foundation, internal floating roofs for each one
  • Installation of 1,100 subgrade controlled modulus column (CMC) supports beneath northernmost tank to overcome inadequate subsurface layer
  • Hydrotesting
  • Painting tanks
  • Cut/fill to balance 20 acre site,
  • Demolition of two existing homes
  • Protection of existing pipelines crossing site
  • Approximately 300,000 direct Matrix NAC man hours.