Donaldsonville Sulfur Forming

Location: Donaldsonville, Louisiana

Matrix PDM Engineering was awarded a contract to process 4,000 tons per day utilizing the Devco II Sulfur Forming Process. The design includes two parallel trains of 2,000 tons per day capacity. It is being installed at the Faustina Facility in Donaldsonville, LA.

This contract was awarded in Oct. 2004 and the FOB portion was completed on schedule.

2000tpd
Forming capacity per unit
4000tpd
Total sulfur forming capacity
100%
Commitment to safety

Scope of Work

  • Engineering
  • Devco II Sulfur Forming
Devco II Sulfur Forming
Matrix PDM Engineering

Put Our Standard